Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 90 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Westmeath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Westmeath County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Westmeath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Westmeath County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(a) RETENTION for as constructed dwelling from that previously granted Planning Reference 06/2061 & (b) install a proprietary wastewater treatment system & percolation area
Of alterations and amendments made to floor plan layouts and elevations of storey and a half type dwelling during construction, revised site layout, revised site boundaries from that previously granted under planning ref no. 06/2189 and permission is sought to complete the development and all ancillary site works.
The construction of a single storey detached dwelling with a storey and a half mezzanine, detached garage, proposed entrance off the public road, proprietary wastewater treatment system and packaged tertiary unit and all ancillary site work. Site works to include new agricultural field access
Construction of a single storey dwelling house, domestic garage, new entrance and install a sewage treatment system with percolation areas together with all associated site development works
Retention of floor plan and elevation changes, also site plan and site layout with revised boundaries from that previously granted under Planning Ref: No.17/6203
Construction of a dwelling house, detached garage with septic tank and percolation area with all ancillary site works
The brief summarizes the pattern across all 90 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460323The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief