Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 212 decisions within 5 km, 4 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to retain and complete dwelling house previously granted permission under P06/2146 together with proposed rear extension and associated site works in accordance with plans submitted.
Retain and complete an existing dwelling house and domestic garage which were previously granted permission under P06/2149 including effluent treatment system and site boundaries as constructed on site, together with all associated site works and connection into existing services
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ASSOCIATED SITE WORKS
CONSTRUCT A FOOTBRIDGE ON LANDS TRAVERSING THE ROSSOW RIVER TOGETHER WITH ALL ASSOCIATED SITE WORKS AND SERVICES
Construct dwelling house, garage, wastewater treatment unit and percolation area
CONSTRUCT A PRIVATE DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER TOGETHER WITH ALL ANCILLARY SITE WORKS
The brief summarizes the pattern across all 212 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24449The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief