Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 242 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
AS CONSTRUCTED SUB-STRUCTURES BUILDING WORKS COMPLETED TO THE DWELLING HOUSE UNDER GRANT OF PLANNING PERMISSION (06/21605 & 11/20426) AND PERMISSION FOR COMPLETION OF THE DWELLING HOUSE, CONSTRUCTION OF A DOMESTIC GARAGE, A WASTEWATER TREATMENT PLANT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) TWO TEMPORARY MOBILE HOMES LOCATED ON THE SITE (2) SITE ENTRANCE, WASTEWATER TREATMENT SYSTEM, TEMPORARY STORAGE UNIT (PLANNING PERMISSIONS 07/20512 & 12/20145 REFERS) AND PERMISSION FOR CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE WITH FUTURE ATTIC DEVELOPMENT, DOMESTIC GARAGE, UPGRADING OF WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
INSTALLATION OF A DOMESTIC WASTE WATER TREATMENT SYSTEM AND PLACEMENT OF A MOBILE HOME ON THE SITE FOR TEMPORARY ACCOMMODATION WHILST RENOVATING THE EXISTING DWELLING
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF (1) DWELLING HOUSE WITH EFFLUENT TREATMENT SYSTEM AND POLISHING FILTER AND (2) DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW DWELLING HOUSE AND DOMESTIC GARAGE, INSTALLATION OF A PROPRIETARY SEWERAGE TREATMENT SYSTEM, PERCOLATION AREA AND ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 242 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2150982The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief