Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 105 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
And completion of 5 no. dwelling houses (Originally granted under Planning Ref. no 06/2445) on revised site boundaries and relocating of pumping station along with associated site works and services. Gross floor space of work to be retained: 757.20 sqm
Of the following; 1. The existing domestic garage/fuel store. 2. The existing storage shed & 3. the existing boiler house serving the dwelling house and all ancillary site works
To construct community walkway to the perimeter of existing football pitch along with fencing & lighting & associated siteworks
To construct dwelling house and domestic garage, connection to public sewer along with associated siteworks. Gross floor space of proposed works: 253 sqm(H), 60 sqm(G)
To: (1) construct walkway lighting to existing perimeter walkway of playing pitch, (2) erect ball practice netting, (3) plant sensory garden along with associated site works
For the development of training pitch, floodlighting, perimeter fencing, ball stop nets, gravel perimeter walkway and associated siteworks.
The brief summarizes the pattern across all 105 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21127The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief