Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 439 decisions within 5 km, 3 exact-site or onsite candidate records, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For continued use of the existing quarry to the permitted depth of minus 5 mOD, including drill-ing, blasting, crushing, processing, stockpiling of materials, associated roads and ancillary services (granted under Planning Ref. File No.: 09/1958 and ABP Ref.: PL07.235821); Continued use of open storage areas; Continued use of existing permitted concrete manufacturing facility (granted under Planning Ref. File No. 09230 and 19/517: ABP-304769-19); Continued use of the existing office (granted under Planning Ref. File No.: 09/1958 and ABP Ref.: PL07.235821); Continued use of the existing maintenance shed (granted under Planning Ref. File No. 09610); Continued use of the existing water management system (including settlement lagoons), weighbridge and wheelwash; Lateral extension of the existing permitted quarry area over a previously permitted extraction area (granted under Planning Ref. File No. 06/4125) of c.4.6 ha. area to a final floor level of minus 5 mOD. The total quarry extraction area will be c. 13 Ha.; Restoration of the application area to natural habitat after uses following completion of ex-traction. The proposed development is within an overall application area of c. 27.5 hectares and is for a total period of 22 years (comprising an operational period of 20 years followed by 2 years for restoration). This application is accompanied by an Environmental Impact Assessment Report (EIAR)
To continue quarrying with associated roads and ancillary services and to operate a concrete batching plant and a bitumen batching plant within the quarry. The 13 hectare extraction area and the 27.5 hectare site boundary remains identical to that outlined in the existing quarry planning permission for Coshla Quarries Ltd (P06/4125). An Environment Impact Statement (EIS) will be submitted with the application
For a twenty year planning permission for the continued operation of the existing quarry and all associated uses and activities, as well as for an extension to the existing quarry extraction area and all associated site works including landscaping arrangements. The proposed quarry extraction area extension is on lands to the north, south and east of the existing quarry and the additional extraction area amounts to approximately 6.7 hectares. The application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Statement.
Of development consisting of a concrete batching plant, which is an extension to an existing concrete batching plant permitted under Pl. Ref. No: 09/230, and includes for associated structures and hardstanding areas. Gross floor space of work to be retained: 38 sqm
For a ten-year planning permission for the development of an up to 100MW Battery Energy Storage Facility that will provide energy services to the national grid and will be delivered in 4 no. phases. The development will consist of the construction and operation of up to 34 metal containers to store up to a project total of up to 100MW in sealed battery cells each with entrances, fire suppression systems, heating, ventilation and air conditioning systems. The proposed development includes for inverters, control systems, other electrical components, security lighting and ancillary infrastructure and all associated works including security fencing and ancillary grid infrastructure. Gross floor space of proposed works: 2186.6 sqm
To refill an existing disused quarry with inert material
The brief summarizes the pattern across all 439 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560220The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief