Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 275 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
COMPLETION OF CONSTRUCTION WORKS OF 33 NUMBER DWELLING HOUSES CURRENTLY UNDER CONSTRUCTION AND ORIGINALLY PERMITTED AS PART OF A SCHEME OF 45 DWELLING HOUSES UNDER PLANNING REF 99/4329 KNOWN AS 'ARD TOMAIRE' (EXTENSION OF DURATION REF 06/60536) AND WORKS TO INCLUDE ALL ASSOCIATED SITE DEVELOPMENT WORKS
DEVELOPMENT OF A SHARED COMMUNITY SPACE TO BE LOCATED ALONG THE FORMER RAILWAY LINE AND WHICH SHALL INCLUDE THE FOLLOWING (A) PEDESTRIAN FOOT WALKS, SEATING AND EXERCISE AREAS (B) COMMUNITY GARDEN AREAS/ZONES AND PLANTING TO ALL BOUNDARY AND EMBANKMENT AREAS (C) ERECTION OF A POLYTUNNEL STRUCTURE AND OUTDOOR CLASSROOM BUILDING AND (D) CONSTRUCTION OF A CAR PARKING AREA, PEDESTRIAN LINKAGE POINTS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO FACILITATE DOWNSTAIRS BEDROOM AND EXTENDED HALLWAY TO ACCOMODATE STAIR LIFT
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO FACILITATE DOWNSTAIRS BEDROOM AND EXTENEDED HALLWAY TO ACCOMODATE STAIR LIFT
CONSTRUCTION OF AN EXTENSION TO THE SIDE OF EXISTING SCHOOL BUILDING TO PROVIDE ADDITIONAL STORAGE PROVISION AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN EXTENSION TO EXISTING COMMUNITY HALL AND CHANGE OF USE OF EXISTING STORAGE SHED TO PROVIDE ANCILLARY ACCOMMODATION INCORPORATING A MULTIPURPOSE COMMUNITY SPACE. WORKS SHALL INCLUDE PROVISION OF NEW WINDOW AND DOOR OPENINGS TO THE EXISTING STRUCTURE AND ASSOCIATED SITE DEVELOPMENT WORKS. THIS PROPOSAL WILL REQUIRE THE CARRYING OUT OF WORKS TO A PROTECTED STRUCTURE; PRESBYTERIAN CHURCH HALL / MEMORIAL HALL (RPS REG. No. 40832014)
The brief summarizes the pattern across all 275 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1951296The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief