Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 245 decisions within 5 km, 3 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Retention permission for the retention and completion of the construction of 2 number two storey dwelling houses with revised site boundaries and position of dwelling houses, proprietary waste water treatment system and new vehicular accesses. Retention and completion of double garage on site 2 and all associated works.
Permission to complete construction of 2 number, two storey dwelling houses with waste water treatment system, new vehicular access and associated site works. Planning permission originally granted under 06/760. Significant further information relates to the retention and completion of double garage on Site 2 and all associated site works
Permission for a change of house type B from that previously granted under P19/218, together with all ancillary site works
Permission for development consisting of change of house design in substitution of planning approval ref 19/89, alterations to domestic garage design and location, landscaping and all ancillary site works
Permission to construct a two storey detached dwelling, single-storey attached domestic garage, new entrance with gate and piers, wastewater treatment system & all associated works
Construction of a dormer type dwelling house with waste water treatment system, new vehicular access and associated site works
The brief summarizes the pattern across all 245 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18369The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief