Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 120 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For permission and retention permission subsequent to the grant of permission PD/06/886 together with all ancillary site works. The development will consist/consists of; 1. Retention permission for (a) Changes to the existing public house and residential accommodation as constructed (principally an increased floor area, mainly the first floor, resulted from a larger roof pitch and a gabled end to the rear etc). (b) Changes to the existing On-site Wastewater Treatment and Disposal System as installed following the Discharge License Ref. No. WP-10-07A. 2. Planning permission for; (a) Alterations and an extension to the existing, public house (principally a new kitchen area, dining area and additional toilets etc.) and residential accommodation (principally two additional B&B bedrooms and a two bedroom apartment etc.) (b) Change of use from residential (domestic) to seven B&B bedrooms. (c) The construction of an ancillary storage unit, (c/w first floor gym and storage which is associated with /ancillary to the existing residential (domestic) use of site) at
To retain existing site boundaries as constructed which differ from those granted under PD/99/207 at
Planning permission to construct (I) an all-weather astro-turf pitch, with 6 No. 8m high floodlights and safety mesh fence around pitch perimeter; (ii) playground area and (iii) walking track, with pedestrian access to the site, along with all ancillary site works and services at
Retention permission for alterations carried out to the existing domestic storage shed, retention of existing front boundary fence and all ancillary site works at
To revise site boundaries and all ancillary site works from that previously granted under PD/05/189 and to retain as constructed elevation changes to front and side of existing house from that previously granted under PD/05/189 at
I) to demolish derelict dwelling house and shed ii) to construct a new dwelling house and effluent treatment system along with all ancillary site works and services at
The brief summarizes the pattern across all 120 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19221The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief