Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 559 decisions within 5 km, 3 exact-site or onsite candidate records, and 43 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
43 structured nearby appeal records.
43 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention permission for as constructed amendments to the dwelling granted under Planning Reference 07/1255, the amendments to the as built dwelling consists of a curved stone faced two storey section to the entrance area of the east elevation, the curved section of roof over and increased eaves and roof height of same. Permission is also sought for the provision of a timber post and rail fence to the south site boundary and landscaping to the south and west site boundary and all ancillary site works.
A detached two-storey residence, a domestic waste water treatment system and percolation area as well as ancillary site works
Permission is being sought to replace existing effluent treatment unit. The application will also include a new percolation area and all associated site works and drainage
Construction of a three-bedroom dwelling. The application will also include the introduction of a new entrance, effluent treatment unit with percolation area and all associated site works and drainage
Construction of a three-bedroom dwelling. The application will also include the introduction of a new shared entrance with the adjoining property, an effluent treatment unit with percolation area and all associated site works and drainage.
Retention of existing shed with all associated site works
The brief summarizes the pattern across all 559 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 187037The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief