Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 255 decisions within 5 km, 4 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for retention of existing entrance piers and wall layout. Entrance piers and walls were previously granted as part of planning permission Ref No. 07/1396
Permission for a proposed development consisting of a new single storey dwelling, garage and all associated site works
Retention permission consisting of 1. Retention of partially constructed cattle shed with slatted underground slurry tank and will consist of 2. Permission to complete the development together with all ancillary site development works. Significant Further Information/Revised plans have been submitted in respect of this development
Permission to construct a domestic garage to include a games room and storage with all associated site works
Permission for a dormer style dwelling, wastewater treatment system and percolation area, new vehicular entrance, entrance walls and piers together with all ancillary site development works and retention permission for a mobile home located on site for a temporary period of a maximum of 5 years during construction of the proposed dwelling house. Significant Further information relates to retention permission for a single storey agricultural machinery storage shed located on site and permission is sought for the provision of a new entrance and access to the shed at an alternative location with the permanent closure of the existing entrance and access.
Permission for 1. Retention of infilling of low-lying lands with soil, subsoil and inert material & 2. Permission to infill adjoining lands with soil, subsoil and inert material in order to raise the levels and reclaim the land for agricultural purposes together with all ancillary site development works. The lands will be covered with topsoil and reseeded with grass when completed. Significant information relates to ecological assessment of the site and revised site layout plan.
The brief summarizes the pattern across all 255 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2430The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief