Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 148 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission for retention of alterations to storage shed for building equipment (previously granted under planning ref no. 07/2149), permission for retention of change of use of said storage shed to engineering workshop; permission for retention of (a) existing engineering workshop, (b) machine workshop, (c) portacabin store, (d) power washer house, (e) compressor house, (f) portacabin incorporating office, toilet and canteen, (g) concrete apron, (h) hard standing area, (i) septic tank and (j) existing site entrance as constructed: permission to construct (a) a storage building for storing engineering parts and equipment, (b) a new engineering workshop incorporating a water storage tank, (c) a percolation area to serve existing septic tank, (d) alterations to site bounds and carry out all associated site works
Permission sought to restore alter and extend a ruined dwelling to habitable dwelling to include the following works: (A) Restore ruined dwelling to habitable dwelling including altering floor levels and raising of existing roof level (B) Demolish existing ruined extension to rear, front and side (C) Construct new two storey extension to the rear and a new single storey extension to side (D) Restore existing attached store-room to the side to include the provision of 2 no. new window openings to east elevation of same (E) Install new sewage treatment system and for all associated site works.
Permission for the retention of existing detached domestic garage
Construct a dwelling house, domestic garage and carry out all associated site works
Construct a cattle house with slatted slurry tank, roof existing cattle holding yard and carry out all associated site works
Permission for retention of existing cattle house with slatted slurry tank, permission to (a) construct an extension to existing cattle house, (b) extend existing slatted slurry tank, (c) construct an extension to existing machinery storage shed and carry out all associated site works.
The brief summarizes the pattern across all 148 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21/633The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief