Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 345 decisions within 5 km, 3 exact-site or onsite candidate records, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct a new workshop building and to relocate existing commercial business previously approved under planning application ref. no. 07/2263 into same, PERMISSION is also sought to connect new workshop to existing proprietary wastewater treatment system and percolation area, upgrade and alter existing entrance off public road, together with all associated site works
To construct a single storey extension to the rear of existing dwelling, upgrade original septic tank and percolation area with new sewage treatment unit percolation area, and all associated site works
To (a) construct a single storey extension to the front (south) of the existing dwelling (b) construct a single storey extension to the side (west) of the existing dwelling (c) construct a single storey porch to the side (east) of the existing dwelling (d) construct new wing walls and piers at existing entrance (e) construct a new domestic garage (f) demolish existing derelict dwelling and pump-house and (g) upgrade existing septic tank and percolation area and all associated site works
To (a) Construct a single storey, granny flat extension to the rear of our existing single storey detached dwelling by including conversion of the existing detached garage and form a glass link connection to the existing dwelling. (b) Form new connection to the public foul drainage system and (c) all associated site works
To retain detached domestic garage erected to side/rear of existing dwelling house, together with all associated siteworks
Further to previous planning approval for office use on this site granted under planning permission Ref. No. 17/188, PLANNING PERMISSION is now sought to construct a single storey detached office building, tap into existing connections on site to public foul sewer and watermain, access new building via existing driveway and entrance, together with all associated site works
The brief summarizes the pattern across all 345 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23232The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief