Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 1,330 decisions within 5 km, 2 exact-site or onsite candidate records, and 239 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
239 structured nearby appeal records.
239 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of a single-storey extension, an area of 81 sq. m, to the south of the existing dwelling, plus all associated landscaping and site works. Additional Information Received 30/07/25 Clarification of Additional Information Received 15/12/2025
Permission for the construction of a single storey detached 4 bedroom dwelling, wastewater treatment system, landscaping and boundary treatment, modifications of the existing vehicular entrance onto Old Brazil Way and all ancillary works to facilitate the development. AI received 2/3/2022
The upgrade and relocation of an existing agricultural entrance.
The retention of the existing storage building, offices, staff welfare facilities, car-parking and hard-standing service yard. existing site servicers parking and hard-standing service yard. Retention Permission and Permission for the permanent continuation of use of the site and the existing structures and hard-standing service yard on site associated with the daily operations of the facility, including the parking and storage of plant hire equipment, existing site services, boundary treatments and all ancillary site development works necessary to facilitate the permanent use of the facility on site.
The development consists of: Retention planning permission required for: (i) the change of use of 2 no. existing single-storey outhouses to hotel accommodation (comprising 4 no. en-suite guest bedrooms) and a utility/plant/store room; (ii) construction of a single-storey cabin to provide 1 no. en-suite guest bedroom. In total, there are 5 no. additional guest bedrooms; Planning permission required for: (a) the installation of a new wastewater treatment system to serve the property; and (b) all associated works, inclusive of drainage, landscaping and boundary treatments necessary to facilitate the development.
Retention planning permission required for: (i) the change of use of 2 no. existing single-storey outhouses to hotel accommodation (comprising 4 no. en-suite guest bedrooms) and a utility/plant/store room; (ii) construction of a single-storey cabin to provide 1 no. en-suite guest bedroom. In total there are 5 no. additional guest bedrooms; and (iii) all associated works, inclusive of drainage, landscaping and boundary treatments necessary to facilitate the development.
The brief summarizes the pattern across all 1,330 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record F25A/0417EThe site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief