Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 174 decisions within 5 km, 7 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DEMOLITION OF EXISTING PARTIALLY CONSTRUCTED BUILDING, (2) INTERNAL PLAN ALTERATIONS TO INCREASE NO. OF APARTMENTS APPROVED UNDER PLANNING REF. NO. 23/51192 FROM 17 TO 19 UNITS AND (3) MINOR ALTERATIONS TO ROOF AND FACADE DESIGN OF PREVIOUSLY GRANTED PLANNING REF. NOS. 23/51192 & 07/40652
(1) COMPLETION OF WORKS GRANTED UNDER PLANNING REF. NO. 07/40652, (2) CONNECTION TO PUBLIC SEWER, (3) ALTERATION OF THE PREVIOUSLY GRANTED ROOF DESIGN WHICH WILL ALLOW FOR AN ADDITIONAL APARTMENT BRINGING THE TOTAL NUMBER OF UNITS TO 17 AND (4) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
(1) CHANGE OF USE OF GROUND FLOOR OF THE FORMER POST OFFICE BUILDING INTO OPEN PLAN OFFICE ACCOMMODATION INCLUDING CANTEEN, TOILETS (2) ELEVATIONAL CHANGES ON GROUND FLOOR, (3) DEMOLITION OF 33.65 SQ AREA ON GROUND FLOOR, (4) PROPOSED NEW INSULATED METAL DECK ROOF COVERING, AND (5) ALL ASSOCIATED SITE WORKS
OUTDOOR COVERED AREA AND PERMISSION TO ENCLOSE REFUSE AREA WITH THE ERECTION OF A NEW WALL AND FOR ALTERATIONS TO EXISTING RAILINGS ON SW BOUNDARY.
INSTALLATION OF ROOF-MOUNTED SOLAR PHOTOVOLTAIC PANELS TO THE REAR OF BUILDING
UPGRADE WORKS AT LIFFORD WASTEWATER TREATMENT PLANT AS FOLLOWS: (1) NEW INLET WORKS (2) 2 NO. PRIMARY SETTLEMENT TANKS (3) STORMWATER HOLDING TANK AND STORMWATER RETURN PUMPING STATION (4) 4 NO. ROTATING BIOLOGICAL CONTRACTOR (RBC) UNITS (5) 2 NO. FINAL SETTLEMENT TANKS (6) CONSTRUCTION OF AN ADMINISTRATION BUILDING (7) ERECTION OF PICKET FENCE THICKENER (8) SLUDGE STORAGE TANK (9) CONSTRUCTION OF RETAINING WALL ALONG NORTHERN BOUNDARY OF THE SITE (10) ERECTIONOF NEW SECURITY FENCE (11) CONSTRUCTION OF SITE ROADS AND SITE LIGHTING (12) DEMOLITION OF THE EXISTING SEPTIC TANK AND ADMINISTRATION BUILDING (13) DECOMMISSIONING OF EXISTING INLET WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
The brief summarizes the pattern across all 174 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560542The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief