Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
29% of nearby decided applications were refused. The site check found 35 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Chun cead coinneáill ar athraithe atá déanta ar theach cónaithe faoi chead pleanála 07/4807 & 17/1278 ar theorainn nua. Spás urláir comhlán na hoibre atá le coinneáil: 276 sqm.
Le haghaidh garáiste baile a thógáil ar an suíomh seo. Spás urláir comhlán na n-oibreacha beartaithe: 56 msq.
Leis an bhforbairt breise a cuireadh thuas staighre lena detach cónaithe faoi Uimh. Tag. 98/288 a choinneál. Tá said ag iarraidh freisin an enurement clause a bhí ar ar gcead pleanála a chur ar leataobh. Spás urláir comhlán na hoibre atá le coinneáil: 84 sqm
For the erection of a 15-metre high tower supporting 4no. radio-link dish, a ground-level dual bay cabinet, palisade fence and gate, fibre chamber, concrete plinth, ESB mini pillar and white stone compound ground finish. The development is required to carry the broadband data from the new high speed fibre broadband network on the island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed
Do bhóthar rochtana nua agus carrchlós. Beidh soláthar bhóthar rochtana nua agus carrchlós le freastal ar fhoirgneamh Reatha Chomhar Chuigéal mar chuid den fhorbairt. Beidh 30 spás sa gcarrchlos, ar a n-áirítear spás inrochtana páirceála amháin, 2 spás luchtála do feithiclí leictreacha, cheithre spás páirceála do mhionbhusanna (dhá spás luchtála do feithiclí leictreacha san áireamh), athruithe ar an mbealach iontrála chuig an sufomh agus na hoibreacha gaolmhara ar fad
For 1) changes of elevations and floor plans, 2) existing entrance on previously granted planning ref: 06/3652. Gross floor space of work to be retained: 177.12 sqm
The brief summarizes the pattern across all 35 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211493The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief