Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 81 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To retain and complete partially constructed dwelling house, garage, wastewater treatment system and all associated works previously permitted under planning references (07/5210, 13/94, 02/4697, 08/994) Gross area of retained works: 293sqm (dwelling house) and 50.79sqm (Garage)
For the construction of an extension to the existing dwelling house. Gross floor space of proposed works 61 sqm.
For a new dwelling house, domestic garage, on site sewage treatment system, along with all associated works. Gross floor space of proposed works: 217.3 msq & 45 msq
For the demolition of an existing building and the construction of a new single storey dwelling, with vehicle access and a foul water treatment system complete with all site services and ancillary siteworks
For the construction of a new dwelling house, domestic garage, on-site sewage treatment plant and percolation area and all associated works. Gross floor space of proposed works Dwelling 186.0sqm, Garage 41.2sqm.
For the construction of a dwelling house, treatment unit and all associated services. Gross floor space of proposed works: 182.43 sqm
The brief summarizes the pattern across all 81 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2260667The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief