Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 59 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The continued operation of the existing Knockastanna Wind Farm; as permitted under Limerick County Council Planning Register References 01/1385 (An Bord Pleanala Reference PL13.130938), 07/758 (An Bord Pleanala Reference PL13.224401), and 08/7007; for a further period of 15 years following the expiry of its current planning permission. The existing windfarm comprises (i) 4 No. wind turbines and associated turbine foundations and crane hardstandings; (ii) 1 No. site entrance and 2 kilometres of site access tracks; (iii) 1 No. electrical control building with a gross floor area of 66 square metres, electrical equipment enclosure and wastewater treatment system; (iv) underground electrical and communications cabling; and (v) all drainage, signage, and all ancillary site infrastructure. The proposed development does not comprise any modifications to the existing windfarm and there will be no increase in the number or dimensions of the permitted wind turbines. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) which includes an assessment of the likely impacts of the proposed development, as a whole and in combination with the relevant off-site or secondary developments which will occur as a direct result of the proposed development. This planning application is also accompanied by a Natura Impact Statement (NIS)
A new dwelling with garage, entrance, and wastewater treatment system and polishing filter percolation area with all associated siteworks
Site location, site layout plan and as constructed dwelling and garage
An uncompleted agricultural store and permission to complete works to the store and all associated site works. Retention permission is also sought to retain lean-to roof with open parking area under at the dwelling,
A new agricultural entrance from the public roadway and close up an existing entrance for road safety reasons
To renovate and extend existing dwelling house, construct new storage shed, upgrade waste water treatment system along with all ancillary site works
The brief summarizes the pattern across all 59 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22646The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief