Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 654 decisions within 5 km, 6 exact-site or onsite candidate records, and 48 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
48 structured nearby appeal records.
48 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A SINGLE STOREY (782M2) EXTENSION TO THE REAR OF THE EXISTING WAREHOUSE, AND ALL ANCILLARY SITE WORKS (PREVIOUSLY GRANTED PLANNING PERMISSION REF: PL2/07/911).
THE CONSTRUCTION OF A SINGLE STOREY PORTAL FRAME WAREHOUSE AND ALL ASSOCIATED SITE WORKS
A PROPOSED NEW CIVIC AMENITY SITE TO INCLUDE: (A) NEW MOBILE WEIGHBRIDGE, (B) NEW OPERATION KIOSK, (C) RELOCATION OF EXISTING STAFF CARPARK TO ACCOMODATE PROPOSED NEW CIVIC AMENITY SITE, (D) NEW STORM DRAINAGE PETROL INTERCEPTOR AND OUTLET PIPE, AND ALL ASSOCIATED SITE WORKS
Existing machine/tool shed & existing assembly workshop structures as constructed and permission for additional on-site car parking spaces, surface water drainage & attenuation and all associated site development works at McDonald International Limited
Existing machine / tool shed & existing assembly workshop structures as constructed and all associated site development works at McDonald International Limited.
(A) CONSTRUCTION OF A NEW SINGLE-STORY METAL FABRICATION AND WELDING TRAINING WORKSHOP BUILDING WITH ANCILLARY CANTEEN, CLASSROOM, TOILETS & OFFICE ACCOMMODATION AND ALL ASSOCIATED SITE WORKS TO COMPLETE THE DEVELOPMENT AND (B) RETENTION PERMISSION FOR EXISTING PRECISION SHED AND EXISTING PREFABRICATED OFFICE BUILDINGS
The brief summarizes the pattern across all 654 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21129The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief