Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 47 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a dwelling house with ancillary works on site previously granted under P08/1015
RETAIN DOMESTIC GARAGE AND ALTERATIONS TO EXISTING DWELLING HOUSE
RETAIN A DOMESTIC GARAGE AND ALTERATIONS TO EXISTING DWELLING HOUSE
INSERT 4 NO. ROOFLIGHT WINDOWS AND RETAIN EXISTING FIRST FLOOR AREA PREVIOUSLY ADDED TO EXISTING DWELLING HOUSE.
CONSTRUCT EXTENSION TO EXISTING DWELLING HOUSE AND TO INSTALL A PROPRIETARY EFFLUENT TREATMENT SYSTEM
CONSTRUCT A SLATTED SHED
The brief summarizes the pattern across all 47 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24378The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief