Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 328 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) CONTINUATION OF USE OF THE EXISTING FACTORY SITE AT RANGUE AS PRESENTLY PREMITTED UNDER PLANNING PERMISSION PL 08/125728 (2) EXTRACTION OF AGGREGATES AND PREPROCESSING BY DRY SCREENING AND GRADING IN A NEW CONTIGUOUS SITE IN THE TOWNLAND OF KNOCKNABOOLA FOR SUPPLY TO THE FACTORY SITE AND DIRECT SALE (3) CONSTRUCTION OF TEMPORARY ENTRANCE FROM THE CARAGH LAKE ROAD (L-4021) TO THE PROPOSED NEW EXTRACTION SITE AT KNOCKNABOOLA (4) CONSTRUCTION OF AN UNDERPASS BENEATH THE CARAGH LAKE ROAD (L-4021) TO FACILITATE THE DIRECT TRANSPORTATION OF AGGREGATES FROM THE KNOCKNABOOLA SITE TO THE FACTORY SITE. AN EIAR AND NIS HAS BEEN SUBMITTED WITH THIS APPLICATION
(1) Demolish rear extension (2) Construct extensions to the rear & side of an existing dwelling house (3) alterations to elevations of existing dwelling house (4) decommission existing septic tank (5) install a new on-site wastewater treatment system (6) Construct an extension to an existing garage (7) Raise ridge and eaves levels, and alterations to elevations of existing garage, and (8) All associated site works.
CONSTRUCT A DWELLING HOUSE AND DOMESTIC GARAGE, ALL COMPLETE WITH ANCILLARY SITE WORKS
(A) CONSTRUCT A SINGLE STOREY WITH ATTIC, TRADITIONAL STYLE DWELLING HOUSE AND DOMESTIC GARAGE (B) INSTALL NEW SEPTIC TANK AND PERCOLATION AREA (C)CARRY OUT ALL ANCILLARY SITE WORKS
CONSTRUCT A DWELLING-HOUSE, SEPTIC TANK AND PERCOLATION AREA, ALONG WITH ALL ANCILLARY SITE WORKS
DEMOLISH EXISTING GARAGE AND ERECT A NEW EXTENSION AT THE NORTH SIDE OF EXISTING DWELLING INCORPORATING KITCHEN/DINING/LIVING/STORE/UTILITY ROOM WITH CONNECTING PORCH AND REPLACE OLD FRONT DOOR WITH WINDOW COMPLETE WITH ALL ANCILLARY SITE WORKS ASSOCIATED WITH THE DEVELOPMENT
The brief summarizes the pattern across all 328 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2233The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief