Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 106 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To complete dormer dwelling which is at ground floor level, construct detached domestic garage and associated site works which was previously approved and commenced under planning reference 08/1417 and extended under 18/554, works completed to date consist of foundations, floor slab, structural steel frame, entrance and installation of effluent treatment system and percolation area
To complete dormer dwelling which is at foundation level, detached domestic garage and associated site works which was previously approved and commenced under planning reference 08/1417, works completed consist of foundations, entrance and installation of effluent treatment system and percolation area
To 1) Retain alterations and location to existing domestic garage. 2) Retain location of existing entrance, piers, site boundaries and all associated and ancillary works previously approved under planning application PL94140
To retain 5 bay slatted cattle shed & all associated works & PLANNING PERMISSION to erect 1 bay to side of the aforementioned shed & all associated works
For the CHANGE OF USE of existing dormer height building (previously approved as Reception Building under planning ref:06/237) to domestic dwelling, alterations to existing plans & elevations and all ancillary site works. RETENTION permission is sought for the as built location and design of the existing building and wastewater treatment system & percolation area, which differs from the previously approved plans
For a single storey domestic extension, internal alterations, connection to existing onsite services and associated works to existing dwelling house
The brief summarizes the pattern across all 106 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460411The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.