Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 230 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Of alterations previously granted under Planning Permission Reference Number 08/428. The alterations include 1) Revised house location within the site, 2) Relocation of site entrance, 3) Retain domestic garage, and 4) All ancillary site development works
For construction of a Dwelling House, Effluent Treatment System and together with site access & all associated site works
For the construction of a new single storey 3 bedroom detached dwelling, a new waste water treatment system and soil polishing filter, new vehicular entrance from private lane, and all necessary ancillary site development works to facilitate this development
For development consisting of (1) the construction of a new two storey 3 bedroom detached dwelling with a single storey pitched roof side projection, (2) the construction of a new detached garage, (3) waste water treatment plant and percolation area, (4) new vehicular entrance and driveway from private lane, and (5) all necessary ancillary site development works to facilitate this development
To construct a two storey dwelling, a detached domestic garage, form a new entrance and driveway from private lane, install waste water treatment system and percolation area, together with all associated site works
To construct bungalow, domestic garage, proprietary treatment unit and all ancillary site works
The brief summarizes the pattern across all 230 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360209The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief