Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 159 decisions within 5 km, 9 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) RETENTION OF DOMESTIC GARAGE, (2) DEMOLITION OF EXISTING DWELLING HOUSE DUE TO DEFECTIVE CONCRETE BLOCKWORK GRANTED UNDER PLANNING PERMISSION REF. NO. 08/70971 AND (3) ERECTION OF A REPLACEMENT DWELLING TO BE CONNECTED TO THE EXISTING PUBLIC MAINS SYSTEM, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
EXTENSIONS AND ATTIC CONVERSION AND ALL ASSOCIATED WORKS CARRIED OUT TO EXISTING DWELLING HOUSE
DEMOLITION OF EXISTING DWELLING HOUSE DUE TO DEFECTIVE MICA BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES AND ASSOCIATED SITE WORKS
(A) AN EXTENSION TO REAR OF SCHOOL CONSISTING OF ONE MAINSTREAM CLASSROOM WITH TOILET FACILITIES, ONE WC FOR ASSISTED USERS, ONE SET ROOM, CONNECTION TO EXISTING PUBLIC SEWER AND (B) REMOVAL OF EXISTING TEMPORARY CLASSROOM AND ALL ASSOCIATED SITE WORKS
(1) RAISING THE CURRENT ROOF LEVEL OF EXISTING DWELLING HOUSE, (2) CONSTRUCTION OF (A) AN EXTENSION TO THE SIDE OF THE DWELLING HOUSE (B) DOMESTIC SHED TO THE REAR OF THE DWELLING HOUSE, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A 2 STOREY DWELLING HOUSE WITH FOUL SEWAGE MECHANICAL TREATMENT PLANT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 159 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660691The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief