Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 886 decisions within 5 km, 5 exact-site or onsite candidate records, and 78 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
78 structured nearby appeal records.
78 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For (a) The change of use of ancillary smoking room to additional single ensuite bedroom. (b) The partial demolition of existing partitions and construction of new partition walls in the reception area. The change of use is accommodated within the existing footprint granted under 09/1197, 14/648 and 20/120 with no additional floor area proposed
(a) the change of use of ancillary day space areas to additional bedroom space, to include the provision of 8 additional residents within 6 single en-suite bedrooms and 1 double en-suite bedroom. (b) retention of 1 window to the West Elevation, the change of use is accommodated within the existing footprint granted under 09/1197 and 14/649 with no additional floor area required
To construct a dwelling-house, entrance from existing access road, connection to existing foul/storm sewer and public water main supply with associated site works and services
To upgrade the playing surface of pitch three to an all-weather synthetic surface of 106 x 66 metres, consisting of: a 2.4 metre-high green welded mesh panel fence surrounding the pitch and an additional internal 1.2m spectator welded mesh panel fence. Behind each goal a ball stop netting, with a total height of 8 metres. Floodlighting the pitch platform to 350 lux and back lighting adjacent pitch to 150 lux with 6 number 15.2 metre-high poles with associated fittings
Development onto the R408, which will consist of the construction of a new detached fully serviced two-storey dwelling house (260sqm) and a separate detached single storey garage (40sqm). Connection to existing public mains water and a packaged wastewater treatment system and polishing filter together with all associated site works
Of an agricultural shed together with all associated ancillary site-works
The brief summarizes the pattern across all 886 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461026The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief