Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Ballythomas East Dunderrow Kinsale Co. CorkOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Ballythomas East Dunderrow Kinsale Co. Cork

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The site check found 661 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.

Matched source
21/6211
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

2 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Register indexed

No structured appeal row is currently tied to the matched decision set.

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

661Nearby applications
2Site-linked candidates
11%Nearby refused
0Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

21/6211

An extension to an existing solar farm development with Planning Permission Reference No. 20/05304 (granted 21/09/2020). The development will comprise of a 5.1 MW solar PV farm on a site at Ballythomas East, Dunderrow, Kinsale, Co. Cork immediately to the east of the existing Eli Lilly Pharmaceutical Plant. The electricity generated will be used by Eli Lilly Pharmaceutical site that currently operates under an Industrial Emissions (IE) License (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The development will comprise of photovoltaic panels on a mix of ground mounted and ballasted frames together with all ancillary cabling and electrical infrastructure; 1 no. single storey substation / transformer cabin; 1 no. single storey maintenance / spare parts cabin; provision of an access track linking to the existing vehicular access track (granted under Planning Permission Reference No. 20/05304) which adjoins the public road (L-7241), temporary construction compound / set-down area; boundary security fencing and CCTV system; underground medium voltage electrical connection from substation / transformer building supplying the immediately adjoining industrial site; and all associated site development works, all on a site of 11.78 acres.

Granted0.0 km04 October 2021
25/5133

Permission to construct a Biomass Steam Boiler Facility that includes: A) Demolition of existing single storey temporary warehouse building. B) Construction of single storey building with parapet height of 20.3m with part mezzanine floors within. C) A chimney stack with height of 23.15m. D) Above ground pipe rack measuring 55m long x 3.5m wide with an overall height of 11.58m. E) Underground services, drainage and other associated site development works. The proposed development is covered by an existing Industrial Emissions (IE) Directive Licence No. P0009-05 under Part IV of the Environmental Protection Agency Act 1992 (as amended). The proposed development refers to a modification to an establishment to which Major Accident Regulations applies.

Granted0.2 km05 August 2025
21/6812

The development consists of a 10 year planning permission for development consisting of an extension to and modifications to a permitted pharmaceutical manufacturing building IE2B, the development will consist of a) a three-storey extension (gross floor area approx. 1,520sq.m. and approx. 27.5m high to parapet) with intermediate access platforms, at the western side of building IE2B, with external ground-mounted plant and equipment, roof stacks, roof-mounted plant and equipment and acoustic screening; b) associated external revisions to the permitted IE2B building including elevational modifications and revisions to roof plan, roof stacks, plant and equipment; c) provision of additional storage vessels (3 No.) in existing bunded bulk solvent storage tank farm to the east of the IE2 building; d) provision of additional bunded waste vessels (2 No.) beside the existing bunded waste solvent tank farm to south of IE4 building; e) provision of additional tanks on southern side of IE2B building (6 No. bunded tanks and 2 No. underground tanks); f) an extension to an on-site berm (permitted under Pl. Reg. Ref. 16/6558) at the south east of the overall complex; g) revisions to internal access road layout on the western side of the proposed extension; h) revisions to the permitted surface water drainage layout and attenuation systems for IE2B and proposed extension to comprise of new underground attenuation tank; and i) all ancillary site works including modifications to underground services, pipe bridges, lighting, hard surfaced areas and all ground works. The development is for the purposes of an activity which requires an Industrial Emissions (IE) License under Part V of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003). The current IE Licence (P0009-04) attached to the site will be reviewed for the purposes of the proposed development.The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies. An Environmental Impact Assessment Report will be submitted to the Planning Authority with the planning application.

Granted0.2 km08 December 2021
18/6137

The development will consist of: (1) The construction of a two storey building (IE40) for staff services and facilities including canteen, kitchen, gym, studio, changing facilities, offices, meeting rooms and administration areas with roof top plant enclosures, (2) Extension to the existing staff car park to provide an additional 150 permanent car parking spaces, (3) The creation of a new vehicular car park entrance gate on the Ballyvrin Road (L3215) northern boundary road, (4) All associated site development works including modifications to the internal site roads and site services, construction of external hard standing and landscaped areas and a single storey ancillary kitchen store, site lighting and fencing, 3 no. flagpoles and associated signage and the formation of landscaped areas, including berms and visual screening with tree planting and contractor’s temporary car park. The site currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site which the Chemicals Act (Control of Major Accident Hazards Involving dangerous Substances) Regulations 2015 (S.I 209 of 2015) applies.

Granted0.2 km05 October 2018
18/4901

The following works at the existing IE09C administration building: (1) Construction of a new single storey extension of gross floor area 92.78m2: (2) All associated internal modifications to facilitate the new extension and (3) All associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an establishment to which the Major Accidents Directive applies.

Granted0.2 km06 June 2018
19/4767

Expansion of the existing 6,000cu.m Firewater Retention Pond to provide a total capacity of 11,000cu.m with alterations to the existing pond as well as the construction of an extended pond area with associated site works which includes reshaping of existing berms, construction of new berms, alteration to access path on berms, site drainage layout (local to pond area) and reinstatement of site landscaping. The site currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I.209 of 2015) applies.

Granted0.3 km10 July 2019

The brief summarizes the pattern across all 661 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required