Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 248 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
An amendment to the development permitted pursuant to Cork County Council Planning Register Reference 09/4399 to increase the operational duration of the existing wind turbine and all associated ancillary infrastructure from 20 years to 30 years from the date of full commissioning of the wind turbine.
A new wastewater treatment system incorporating a new site boundary along with retention of previous alterations and extensions to dwelling house which consists of a ground floor rear extension, a front porch extension, and associated site works.
Construct a dwellinghouse
Construct a dwellinghouse
The construction of a single dwelling house, the renovation and conversion of an existing derelict dwelling house to use as a detached domestic garage (including demolition of existing 12.78 sq. m. / 137.56 sq. ft. single-storey lean-to extension to rear, construction of new roof, and alterations to elevations), the upgrading of an existing site entrance, the installation of a private well, the installation of a wastewater treatment unit and associated soil polishing filter, and all ancillary works.
To construct a new dwelling house.
The brief summarizes the pattern across all 248 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21/4715The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief