1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 105 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) INSTALLATION OF A GRID TRANSFORMER IN THE PREVIOUSLY CONSENTED AND CONSTRUCTED LENALEA WIND FARM SUBSTATION TO PLANNING REFERENCES: 09/50116 AND 20/50835 AND (2) CONSTRUCTION OF AN INDEPENDANT POWER PRODUCER (IPP) BUILDING (MEASURING 149M2) ALONG WITH ASSOCIATED GRID COMPENSATION EQUIPMENT, A DIESEL GENERATOR, AND UNDER GROUND CABLE TRENCHES LINKING THE PROPOSED IPP BUILDING TO THE GRID TRANSFORMER, AUXILIARY EQUIPMENT, A BOREHOLE AND ALL ANCILLARY WORKS
INSTALLATION OF APPROXIMATELY 580M OF OVERHEAD ELECTRICAL CABLE, 2 NO. TWIN WOODEN POLE -SETS AND 2 NO. STEEL END MASTS AND THE DECOMMISSIONING OF APPROXIMATELY 203M OF EXISTING OVERHEAD ELECTRICAL CABLE, ON SITE AREA OF 5.72 HECTARES, FROM THE PROPOSED ELECTRICAL SUBSTATION AT LENALA WIND FARM (PREVIOUSLY GRANTED PERMISSION REF. 09/50116 AND 12/40091) TO EXISTING LETTERKENNY TO BINBANE 110KV OVERHEAD LINE
CONSTRUCTION OF WIND FARM, CONSISTING OF 9 WIND TURBINES OF UP TO 85M HUB HEIGHT AND UP TO 100M BLADE DIAMETER WITH A TOTAL HEIGHT NOT EXCEEDING 135M, A PERMANENT METEROLOGICAL LATTICE MAST 85M HIGH, A SUBSTATION AND ASSOCIATED EQUIPMENT, A BORROW PIT, INTERNAL SITE TRACKS, DRAINAGE AND ASSOCIATED WORKS
ELEMENTS OF WIND FARM INFRASTRUCTURE AND RECTIFICATION OF ASSOCIATED RED LINE BOUNDARY
REVISIONS TO THE LAYOUT OF LENELEA WIND FARM (PLANNING REF:09/50116), 200M OF NEW SECTION OF TRACK AND MINOR ROAD IMPROVEMENTS WITHIN THE ADJACENT OPERATIONAL CARK (PLANNING REF: 02/8328), MEENTYCAT (01/8038) AND MEENALABAN (02/8008) WIND FARMS TO FACILITATE DELIVERY OF TURBINE COMPONENTS TO LENALEA. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING REVISIONS (1) OMMISSION OF PREVIOUSLY PERMITTED PERMANENT MET MAST AND ACCESS TRACK (2) OMMISSION OF PREVIOUSLY PERMITTED TURBINE T1 AND T4 AND ASSOCIATED TRACK (3) OMMISSION OF PREVIOUSLY PERMITTED TEMPORARY CONTRACTORS COMPOUND (4) OMMISSION OF PREVIOUSLY PERMITTED BORROW PIT (5) PROVISION OF PERMANENT MET MAST AND ACCESS TRACK AT A REVISED LOCATION (6) PROVISION OF A NEW MATERIAL STORAGE AREA (7) PROVISION OF TWO NEW EXCAVATED BORROW PITS (8) PROVISION OF A NEW TEMPORARY CONSTRUCTION COMPOUND (9) REVISED SUBSTATION LAYOUT TO MEET EIRGRID SPECIFICATION FOR 110 KV SUBSTATIONS (10) ADJUSTMENT TO ALIGNMENT OF PREVIOUSLY PERMITTED INTERNAL WIND FARM ROADS (11) ALL ASSOCIATED DRAINAGE AND CABLING (12) UPGRADING OF EXISTING ACCESS TRACK FROM OPERATIONAL CARK WIND FARM (PLANNING REF: 02/8328) TO THE PERMITTED SOUTHERN SITE ENTRANCE (13) LOCALISED WIDENING OF THE MAIN ACCESS ROAD THROUGH THE OPERATIONAL CARK (PLANNING REF: 02/8328), MEENTYCAT (01/8038) AND MEENALABAN (02/8008) WIND FARMS TO FACILITATE TURBINE COMPONENT DELIVERY TO LENALEA WIND FARM
(A) DEMOLITION OF SUBSTRUCTURE REMAINS OF FORMER COTTAGE AND (B) CONSTRUCTION OF NEW SINGLE STOREY COTTAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 105 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2351609The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.