Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Cappocksgreen , Ardee , Co LouthOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Cappocksgreen , Ardee , Co Louth

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

17% of nearby decided applications were refused. The site check found 502 decisions within 5 km, 3 exact-site or onsite candidate records, and 42 structured appeals.

Matched source
20135
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

3 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

42 structured nearby appeal records.

42 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

502Nearby applications
3Site-linked candidates
17%Nearby refused
42Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

20135

EXTENSION OF DURATION OF 09/509: Ten year Permission for the construction of: A light industrial / business park of 43,418sqm (gross floor area), consisting of 29 no. light industrial/ warehouse buildings ranging in size from 648sqm to 1944sqm (gfa), each subdividable in up to 8 units, 1 no. building of 1080sqm (gfa) for restaurant and gym use and 1 no. building of 3,236sqm (gfa) for builders providers' use; Associated surface car parking (1,002 spaces); Associated internal road network; Access from new roundabout to N33; 8 no. ESB substations; Entrance totem sign of 5.0m in height; Re-routing of a 38Kv power line traversing the site; Landscaping works including along the River Dee, Captain's Stream & N33 boundary; Foul and surface water drainage, connection to existing public sewer network and all associated site works. An EIS will be submitted to the Planning Authority with the planning application, all on a 19.82 ha site bounded by the N33 to the south, the River Dee to the east, and agricultural lands to the north and west

Granted0.0 km05 March 2020
191084

EXTENSION OF DURATION OF 09509: Ten year Permission for the construction of: A light industrial / business park of 43,418sqm (gross floor area), consisting of 29 no. light industrial/ warehouse buildings ranging in size from 648sqm to 1944sqm (gfa), each subdividable in up to 8 units, 1 no. building of 1080sqm (gfa) for restaurant and gym use and 1 no. building of 3,236sqm (gfa) for builders providers' use; Associated surface car parking (1,002 spaces); Associated internal road network; Access from new roundabout to N33; 8 no. ESB substations; Entrance totem sign of 5.0m in height; Re-routing of a 38Kv power line traversing the site; Landscaping works including along the River Dee, Captain's Stream & N33 boundary; Foul and surface water drainage, connection to existing public sewer network and all associated site works. An EIS will be submitted to the Planning Authority with the planning application, all on a 19.82 ha site bounded by the N33 to the south, the River Dee to the east, and agricultural lands to the north and west

Refused0.0 km17 February 2020
211387

Permission for the construction of a new industrial unit to include ancillary office and canteen accommodation, together with parking provisions, gated entrances, boundary treatments, yard space, company signage, connection to existing services and all associated site works

Granted0.1 km14 January 2022
20569

Permission to construct a steel fabrication workshop to include ancillary offices, material storage yard, connect to existing services and all associated site works *Significant Further Information submitted 23/03/21*

Granted0.1 km09 April 2021
20749

Permission for the construction of a new industrial facility to include 2 no. 3535m2 manufacturing units (9.3m high with part 11.6m high) with ancillary office and canteen accommodation, 1no. 770m2 timber treatment unit 9.2m high, 1 no. 42m2 security unit 3.5m high, hard standing areas together with associated parking provision, gated entrances and boundary treatments, connection to existing road network & drainage system, company signage, together with all other associated ancillary site works. A Natura Impact Statement accompanied the Planning Application

Granted0.2 km13 November 2020
191

Permission for a development to consist of 1 no. light industrial/warehouse building including offices extending to a total floor area of 950sqm. Surface car-parking, internal road network with access from existing roundabout located on N33 vis the site service roadways on adjoining lands to the east. Site development works including enclosed yard to rear of proposed building; site signage; ESB substation; connection to foul water drainage network located on adjoining lands, connection of attenuated surface water drainage to Captains Stream, partial culverting of stream; landscaping and provision of all other utility services.

Granted0.2 km28 August 2019

The brief summarizes the pattern across all 502 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required