Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 706 decisions within 5 km, 5 exact-site or onsite candidate records, and 92 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
92 structured nearby appeal records.
92 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For amendments to planning permission ref: 11/443, as extended by Extension of Duration of planning permission ref: 19/8, in respect of buildings containing a blending plant, for external drying, screens and associated equipment, structural steel support structures and associated platforms, for site works including alterations to existing road and drainage layout and to relocate the energy plant permitted by permission 09/635. The proposed amendments involve repositioning permitted external plant, changes to the layout and design of external plant (primarily the external energy plant and dryer), relocation of the fuel mix area and fuel bin structures and all associated site works
Of planning permission Reference P.11/443
To construct 3No wood based, biomass storage bays an ash storage building and associated site works including road widening to an existing internal road and a new concrete yard area. A Natura Impact Statement will accompany the Application. Smartply Europe currently hold an Industrial Emission Licence issued by the EPA.
For the construction of a new roof on each of the previously granted concrete storage structures (Planning Ref 22/569). SmartPly Europe currently hold an Industrial Emission Licence issued by the EPA
For development. The development will consist of the installation of 5250 Solar PV panels over the roof of existing industrial buildings and all associated site works and services
For one existing filter cleaning system and Planning Permission for the installation of two additional filter cleaning systems at the oriented strand board manufacturing plant
The brief summarizes the pattern across all 706 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19509The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief