Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 285 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention and completion of dwelling which was partially started on site under planning permission 09/7900 with alteration to the design and permission for the installation of a septic tank and percolation area and all associated site works.
Permission for retention and completion of dwelling which was partially started on site under planning permission 09/7900 with alterations to the design and permission for the installation of a septic tank and percolation area and all associated site works.
Permission for extension and alterations to existing dwelling, new vehicular entrance, installation of new waste water treatment system and demolition of existing outhouse and all associated site works.
The construction of dwelling house, installation of treatment unit and percolation area and all associated site works.
The construction of dwelling house, installation of treatment unit and percolation area and all associated site works
Permission to construct a dwelling, domestic garage and all associated site works and services.
The brief summarizes the pattern across all 285 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5816The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief