Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 1,742 decisions within 5 km, 2 exact-site or onsite candidate records, and 191 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
191 structured nearby appeal records.
191 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Change of entrance position and configuration from that permitted in Pl 14/1512 to that permitted in 10/2704
Single storey extension to provide 3 double bedrooms, a music & TV room, internal alterations to the existing dwelling and all ancillary works as required. Works include additional roof alterations, new rooflights and windows, to the existing dwelling
Construction of new dwelling, accessed via existing entrance off private drive, domestic garage, bored well, effluent disposal system to EPA guidelines 2009 and associated siteworks
Construction of a new dwelling accessed via existing entrance off private driveway, connection to mains water, effluent disposal system to EPA guidelines 2009, reduce site size on planning permission ref 20/981 and associated site works
Upgrade of existing effluent disposal system and percolation area in full accordance with EPA COP 2009 standards and all associated site works
1) Construction of new 227 sqm 4-bedroom family dwelling as per previous outline planning ref: 17/1223. 2) Construction of new septic tank as per previous planning ref: 17/1223. 3) New vehicular entrance. 4) All ancillary site works
The brief summarizes the pattern across all 1,742 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18420The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief