Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
28% of nearby decided applications were refused. The site check found 195 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Increased capacity of the existing sessional pre-school from 23 children to 30 children, which was previously granted planning permission under file ref no: 04/932 & 10/459 & 19/1063
Retention and continuance of use of existing sessional pre-school, which was previously granted planning permission under file ref no. 04/932 & 10/459
For erection of 2nr 7metre-high flagpoles & 1nr 8metre-high flagpole along with all associated site development and facilitating works
1. Development of new, one and a half-storey Contemporary style "Bed & Breakfast" Guest House of 255m² over 31m² Basement, Five Bedrooms (two of which are Guest Rooms), on site area of 0.15ha. 2. Reconstruction of neighbouring historical cottage, which will serve as of ancillary accommodation to "Bed & Breakfast", with two guest bedrooms on site area of 0.05ha. 3. Effluent treatment system for both properties, and all associated ancillary site works. 4. Upgrading Existing Farm Gate entrance to recessed residential use entrance, with new gates and piers
Change of design to existing planning permission (File No. 20893). Change of design to the one and a half-storey Contemporary style "Bed & Breakfast" Guest House with Five Bedrooms (two of which are Guest Rooms), on site area of 0.15 ha. Changes Include: 1. Removal of Basement and 2. Minor alterations to elevations. All other items on original files to remain unchanged: 1. Reconstruction of neighbouring historical cottage, which will serve as of ancillary accommodation to "Bed & Breakfast", with two guest bedrooms on site area of 0.05 ha. 2. Effluent treatment system for both properties, and all associated ancillary site works. 3. Upgrading Existing Farm Gate entrance to recessed residential use entrance, with new gates and piers
(a) Erection of a single storey type house; (b) Garage/fuel store for domestic use; (c) The installation of a proprietary waste water treatment system with soil polishing filter and all associated siteworks
The brief summarizes the pattern across all 195 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22628The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief