Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 1,474 decisions within 5 km, 5 exact-site or onsite candidate records, and 140 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
140 structured nearby appeal records.
140 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development consists of (1) Retention of changes to granted development (Ref 20/868), involving the reduction of new build floor area by 169.5 m2 at ground floor level & 557.5 m2 at first floor level. (2) Retention of new cladding & raised parapet to front elevation of existing building. (3) Planning for new signage to front boundary (previously granted under expired planning ref 10/500062)
The demolition of an existing single storey storage/warehouse area with a floor area of 452sqm, and the construction of a new 2 storey extension including a mezzanine for the purpose of storage with a gross floor area of 1325sqm and all associated site works
For an increase in roof height of 5.2 metres above the existing ridge height in a section of the roof of the existing premix bagging facility building and all other associated site works at the south east end of the existing facility
Two new external silo's complete with concrete foundations and concrete base and all other associated site works at the south east end of the existing facility.
An extension to the premix bagging facility building, a concrete mezzanine floor in the storage warehouse with an internal pallet lift, an external emergency stairway from the mezzanine floor at the south east end of the existing facility and all other associated site works
The construction of a driveway extension at the front of the dwelling and all associated site works and services
The brief summarizes the pattern across all 1,474 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23813The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief