Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 5,759 decisions within 5 km, 1 exact-site or onsite candidate record, and 628 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
628 structured nearby appeal records.
628 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of Proposed multi-purpose Indoor sports, recreation and community facility, demolition of existing East Stand, new covered spectator seating to existing north and south stands and associated landscaping works, for Dublin City University at Morton Stadium: the national athletics stadium. - Demolitions of existing east stand terrace and ancillary undercroft accommodation - Proposed New Indoor athletes training facility, 2-3 storey in height of c. 10.5m and an approximate new overall building area of 3,600sq.m, incorporating indoor running track, Gymnasium, jumps areas, meeting rooms, media facilities and admin office, changing village, public toilets, storage, spectator seating, associated stadium branding, landscaping, and ancillary accommodation. - Alterations to the existing vehicular entrance to the east of the site to provide for new pedestrian plaza and installation of new pedestrian entrance to southeast of the site. - Relocation of existing ESB substation from existing East stand to the south of the site. - Proposed location for bus set down area. - Associated site and wayfinding signage. Site development works comprising; new/altered site access provision and exit points along the public road swords road, including demolitions of existing boundary walls, enhancements to existing car parking, provision of 44 no. cycle parking spaces, new hard surfaced areas to new East stand redevelopment area and associated public lighting, upgrades to existing stadium floodlighting. The development also incorporates, alterations to boundary treatments including associated demolitions and adjustments to ground levels, mainly at proposed new indoor athletes building area location, all associated signage/branding, hard and soft landscaping, services above and below ground, including new foul connection and all ancillary associated site development works. Additional Information received 26/11/25 Clarification of Additional Information received 06/03/2026
Planning permission is sought for: 1. Construction of a single storey extension at the rear of a residential unit. 2. Alterations to existing extension to facilitate new works. 3 Ancillary site works.
Alterations to previously approved development Reg. Ref. F16B/0166
Extension/alterations to a 2-storey, single dwelling detached house as follows: Demolition of the rear ground floor extension, demolition of 2 chimneys, re-instatement of garage on SW side; construction of ground floor flat roof rear extension with 2 roof windows; attic conversion with rear dormer; installation of first floor window on SW elevation; widening of vehicular access from Swords Road; re-modelling of interior, upgrade of heating and insultation for improved energy efficiency and sound proofing; cladding and rendering to all external walls; site landscaping.
Alteration/extension of the existing two storey detached house, compri
Permission for a) attic conversion to include pitched roof dormer to s
The brief summarizes the pattern across all 5,759 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record F25A/0720EThe site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.