Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 514 decisions within 5 km, 2 exact-site or onsite candidate records, and 29 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
29 structured nearby appeal records.
29 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of Retention Permission for the extension to a storage yard previously granted Planning under reference PL11/251, screening berms and all associated ancillary works.
Development consisting of the filling of lands with construction and demolition waste (application area = 1.0 Ha, volume = 24,950 tonnes) together with screening berms and all associated ancillary works
Development consisting of the filling of lands consisting of an area of 1.0 hectares with 100,000 tonnes of construction and demolition waste material, comprising of inert soil and stone, together with screening berms, weighbridge and associated ancillary works. The Planning Application is accompanied by a Natura Impact Statement (NIS).
Development consisting of the filling of land with inert soil/subsoil and construction and demolition waste (Application Area= 0.5 hectares. Approximate volume of fill = 12000 cubic metres (20,000 tonnes)) including associated ancillary site works and landscaping
For development consisting of 1. Demolish existing hosue on site. 2. Construct a replacement dwelling 3. Construct a new septic tank and percolation area. 4. Carry out all associated site development works deemed necessary
Development consisting of the construction of dwelling house with proprietary effluent treatment system and percolation area, construction of garage and all associated site works
The brief summarizes the pattern across all 514 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18175The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief