Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 73 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of a minor lateral extension (c. 2.2 Ha.) to the existing permitted quarry development (Plan File Ref. No. P11/256) within an application area of 2.3 Ha.
The proposed development consists of the continued use of the following facilities and infrastructure, all within the previously permitted processing area (Plan File Ref. No. P04/1684: ABP PL 16.210431 and P22/766) and an application area of 7.7 hectares: administration building (110 m²); workshop (460 m²); filter press building (288 m²); electricity substation (14 m²); wheelwash; weighbridge; fixed processing plant, access ramps and stockpile storage area; existing site access arrangements; run-off treatment system; quarry haul road. Planning permission is sought to continue the use of these facilities and infrastructure for a further 30-year period i.e. until 2055.
RETENTION OF REVISED WHEELWASH LOCATION (41M2), RECONFIGURATION OF FIXED PROCESSING PLANT, ACCESS RAMPS AND STOCKPILE STORAGE AREA; EXISTING SITE ACCESS ARRANGEMENTS; REVISED WORKSHOP LOCATION (460M2) ALL WITHIN THE PERMITTED PROCESSING AREA (REF. NO. P04/1685; ABP PL16.210431)
Demolition of existing shed and to erect a new shed/1 bedroom holiday dwelling, this will also include all other ancillary site services and development works
Demolition of existing shed and to erect a new shed/1 bedroom holiday dwelling, this will also include all other ancillary site services and development works
PERMISSION TO MODIFY THE EXISTING PERMISSION, P08/1997, TO ERECT THREE (3) 1MW TURBINES, CONTROL HOUSE AND ANCILLARY ASSOCIATED WORKS
The brief summarizes the pattern across all 73 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360491The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief