Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 273 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETENTION PERMISSION OF AN EXISTING TELECOMMUNICATIONS SUPPORT STRUCTURE PREVIOUSLY GRANTED UNDER P11/423 TOGETHER WITH ASSOCIATED GROUND EQUIPMENT CABINETS AND SECURITY FENCE
The development will consist of the retention of the existing dwelling house, domestic garage, and sewage treatment system and all associated site works.
CONSTRUCT DETACHED DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
AMENDED DESIGN OF PLANNING APPLICATION REF NO: P18/171 TO CONSTRUCT A DETACHED DWELLING HOUSE, DOMESTIC GARAGE AND PROPRIETARY TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
AMENDED DESIGN OF DWELLING HOUSE ASSOCIATED WITH PREVIOUS PLANNING P18/171 AND P18/696, TO CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
Waste recovery facility for the acceptance, recovery and processing of up to 5,000 tonnes per annum of construction and demolition (C&D) waste including concrete, brick, tile and soil and stone to produce recycled aggregates for export and use in the construction industry
The brief summarizes the pattern across all 273 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21338The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief