Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 393 decisions within 5 km, 3 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CHANGE OF DESIGN OF HOUSE AND DOMESTIC GARAGE AND ORIENTATION OF SAME TO INCLUDE ALL ASSOCIATED SITE WORKS PREVIOUSLY GRANTED UNDER PLANNING REFERENCE 11/60298
ERECTION OF DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF A 2 STOREY EXTENSION TO THE SOUTH EAST SIDE OF THE EXISTING SCHOOL CONTAINING A 3-CLASSROOM ASD UNIT, WITH ASSOCIATED ACTIVITY, SENSORY, LIVING SKILLS & CENTRAL ACTIVITIES ROOMS AND SANITARY FACILITIES AT GROUND FLOOR LEVEL AND 3 GENERAL CLASS ROOMS AND 2 SET ROOMS ON FIRST FLOOR WITH A PROPOSED BASEMENT LEVEL EXTERNAL EQUIPMENT STORE AT THE LEVEL OF THE EXISTING SCHOOL PITCHES AT THE SOUTH OF THE EXTENSION, INCLUDING THE INSTALLATION OF ROOF MOUNTED PV PANELS (2) CONNECTION INTO EXISTING SEWERAGE AND DRAINAGE SYSTEMS ON SITE AND ADAPTATION OF THE EXISTING STORM WATER ATTENUATION TANK (3) FORMATION OF A TEMPORARY CONSTRUCTION ACCESS TO THE SITE FROM DRUMBOE LOWER, ON THE EASTERN SIDE OF THE SITE FOR THE DURATION OF CONSTRUCTION ONLY (4) DEVELOPMENT OF AN EXTENSION TO THE CARPARK AREA TO PROVIDE 9 FURTHER CARPARKING SPACES (INCLUDING AN EV CHARGING POINT) AND ALL ASSOCIATED SITE WORKS
DETACHED GARAGE AND STORE AND PERMISSION FOR CONSTRUCTION OF AN AGRICULTURAL MACHINERY STORAGE SHED AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN AGRICULTURAL MACHINERY STORAGE SHED AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A DWELLING WITH WASTEWATER TREATMENT SYSTEM AND WATER BOREHOLE
The brief summarizes the pattern across all 393 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2151547The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief