Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 856 decisions within 5 km, 3 exact-site or onsite candidate records, and 53 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
53 structured nearby appeal records.
53 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of the existing 36 metre high free standing lattice communication structure carrying antennae and communication dishes within an existing 2.4 metre high palisade fenced compound, previously granted time limited consent LPA Ref 11/6450.
Replacement of existing pylon sign with new VW Commercial Vehicles pylon sign in the same position and all associated works
The erection of a single storey extension incorporating 1 No. mainstream classroom and new main entrance lobby (total floor area of proposed extension = 101.4msq) to the front of existing single storey school building, realignment / setting back of part of the existing roadside boundary wall to provide a bus set down area, provision of a second vehicular access in order to provide a one way traffic policy, provision of 5 No. additional car parking spaces, together with all associated site works
For the existing installation of a single storey portacabin in the grounds of an existing community centre. The portacabin comprises of additional general meeting room and office and all associated works
Planning permission is sought for the construction of a proposed single/two storey extension to side of existing community centre comprising of: additional meeting rooms, consultation room, tea station, toilet facilities to ground floor, stairs to first floor, additional office space, social/education program, tea station, future office space and associated works.
Permission is sought for the construction of a proposed single storey extension(being a replacement/ reduction of permission granted 17/339) to existing community centre comprising of: additional consultation rooms/family room, additional offices, toilets, hallway to front of creche, removable of existing portacabin and associated works
The brief summarizes the pattern across all 856 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1824The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief