Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 308 decisions within 5 km, 11 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission for change of plan of detached building for staff quarters for use ancillary to the Ouvane Falls Hotel approved under planning ref 12/00749 and extended under planning ref. 18/00387
Permission for change of plan of detached building granted under planning reference 12/749 and 18/387, for staff quarters and use ancillary to Ouvane Falls Hotel
Construction of detached building for staff quarters and use ancillary to Ouvane Falls Hotel
Construction of detached domestic garage
Demolition of existing dwelling house and construction of new dwelling house including the following ancillary works; (i) Construction of approx. 4m high rock armour sea wall along high water mark line (ii) improvement works to existing site entrance including provision of 3 no. parking spaces and (iii) all other associated site works
(1) Demolish existing garage to front of an existing dwellling, (2) Construct new ground & first floor extensions to existing dwelling including conversion of existing attic space, (3) Alter existing elevations, and (4)Install new wastewater treatment unit and percolation area and all other associated site works
The brief summarizes the pattern across all 308 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20/762The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief