Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 308 decisions within 5 km, 11 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for change of plan of detached building for staff quarters for use ancillary to the Ouvane Falls Hotel approved under planning ref 12/00749 and extended under planning ref. 18/00387
Permission for change of plan of detached building granted under planning reference 12/749 and 18/387, for staff quarters and use ancillary to Ouvane Falls Hotel
Construction of detached building for staff quarters and use ancillary to Ouvane Falls Hotel
Construction of detached domestic garage
Demolition of existing dwelling house and construction of new dwelling house including the following ancillary works; (i) Construction of approx. 4m high rock armour sea wall along high water mark line (ii) improvement works to existing site entrance including provision of 3 no. parking spaces and (iii) all other associated site works
(1) Demolish existing garage to front of an existing dwellling, (2) Construct new ground & first floor extensions to existing dwelling including conversion of existing attic space, (3) Alter existing elevations, and (4)Install new wastewater treatment unit and percolation area and all other associated site works
The brief summarizes the pattern across all 308 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/762The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief