Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 2,025 decisions within 5 km, 2 exact-site or onsite candidate records, and 164 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
164 structured nearby appeal records.
164 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of Permission for Planning Ref. 13/631: wholesale warehouse storage facility and associated site works
The development that will consist of: (1) Replacement of large B&Q lettering with 1 No. 6.0m x 6.0m internally illuminated sign on front (south-facing) elevation of premises; (2) Replacement of smaller B&Q lettering with 3 No. 4.0m x 4.0m and 1 No. 2.0m x 2.0m internally illuminated signs, 1 No. sign on each of the 4 elevations of premises); (3) Installation of new Entrance arrow (3 sq.m) on front (south-facing) elevation of premises; (4) New orange vinyl to front and side entrance glazing of premises
The development that will consist of: 1 No. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (South-Facing) elevation of B&Q premises
1. Construction of a coffee shop including provision of internal and external seating, 2. modifications to existing car park layout; 3. signage; 4. associated site development works
The demolition of existing single storey side extension. Construction of new rear single storey extension and separate garage. Along with extensive modifications to existing dwelling and all associated site works
The development of a site which adjoins the existing Northern Trust offices and comprises that area of land currently utilised for car parking purposes. It is proposed to modify the car parking layout and car parking numbers as part of the development proposal, including the removal of temporary car parking provided to facilitate construction on site, which shall be restored to green space. This proposed development will replace all un-built and incomplete elements of the development permitted under the planning permission Register Reference 16/693 (extended under Register Reference 21/7006) and planning permission Register Reference 18/1009. The un-built and incomplete elements to be replaced under permission 18/1009 comprise 1 no. 3 storey facility building (4,075sqm) comprising medical, meeting rooms and security facility. The unbuilt and incomplete elements under permission 16/693 extended under 21/7006 include (a) 1 no. 4 storey commercial office building of 9480sqm; (b)1 no. 5 storey commercial office building of 11,850sqm save for groundworks which were commenced; (c) 1 no. level of decked car parking; (d) 2 no. convenience service kiosks to accommodate retail and café uses; (e) 2 no. ESB substations; and (f) upgrade of existing pumping station. The proposed development seeks (i) construction of 3 no. 5 storey buildings each with a floor area of 7,208sqm, to be used for Class 3 office use and / or Class 8 Medical Use, with provision for screened roof top plant; (ii) modification of existing water, surface water and foul sewer infrastructure to facilitate construction of 3 no. buildings; (iii) reconfiguration of existing car parking provision resulting in an overall reduction in car parking numbers, incidental to the provision of commercial buildings, on site; (iv) modification to existing covered bicycle parking to result in increased provision on site with provision for 6 no. bicycle storage buildings with external bin storage facilities (v) provision of landscaping within the public realm and (vi) all associated site works including upgrade of an existing watermain for a distance of circa 900m. Existing access to the site shall be maintained. A Natura Impact Statement has been prepared in respect of the proposed development and accompanies the planning application
The brief summarizes the pattern across all 2,025 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 197015The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief