Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
31% of nearby decided applications were refused. The site check found 29 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a habitable treehouse with connection to an existing foul network previously granted under pl ref 13/769 & 13/771, connection to an existing water supply and associated site works.Gross floor space of proposed works 106.50sqm
To (A) demolish existing conservatory (B) form archway in existing building (C) Construct new two storey extension (D) Construct new bedroom block (E) construct 6 no. detached sleeping pods (F) upgrade existing wastewater treatment system (G) associated site works at The Connemara Hostel, Tullyconor Leenane. (Gross floor space 616.56sqm)
For alterations and ancillary site works carried out on the existing boat shed (Previous Planning Reference No. 08/363). Gross floor space of works to be retained: 72 sqm
For the construction of a new single storey dwelling house with solar panels and a new wastewater treatment system and percolation unit together with all associated site development works and services. Gross floor space of proposed works 318 sqm.
Of 2 storage units. Gross floor space of works to be retained 287 sqm.
For the construction of a two storey dwelling house with photovoltaic solar panels and septic tank connected to existing sewage treatment system pl. ref. 11/218 together with all associated site development works and services. Gross floor space of proposed works: 244 sqm
The brief summarizes the pattern across all 29 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360041The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief