Applications tied to the site
Partial coverage20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,346 decisions within 5 km, 20 exact-site or onsite candidate records, and 121 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
121 structured nearby appeal records.
121 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to retain the continuance of use of existing permitted 2 storey building extension (756sqm) as previously granted for a temporary period of 5 years under Reg. Ref. 14/554. The development consists of the 2 storey unit connected with the main hospital via link at ground and first floor levels and houses the Acute Surgical Assessment Unit with short stay in-patients admission areas
Permission for the construction of a single storey extension to existing two storey Oncology Building, together with all associated site works
Permission will consist of the erection of single storey low and medium voltage plantrooms, a steel gantry plant deck structure with screening over these and existing adjacent plantrooms for location of 2no. generators over, mechanical and electrical service routes including cable ladders and flu chimneys fixed to the adjacent existing 5 storey hospital building elevation, a new concrete plinth for location of an oil tank, and all associated site and ancillary works necessary to facilitate the development.
The development will consist of the erection of a roof level photovoltaic array, a new roof level perimeter edge protection railing, and all associated site and ancillary works necessary to facilitate the development. *Significant Further Information Received on 22/04/2025 - additional roof level photovoltaic arrays proposed *
The construction of a single storey extension to create additional bed spaces to area known as “ground floor west wing”, together with all associated site works.
The development will consist of the Construction of a Temporary Modular Ward Building adjoining the Existing Critical Decisions Unit and Accident and Emergency Department and all associated ground works and all ancillary works necessary to facilitate the development.
The brief summarizes the pattern across all 1,346 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20186The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief