Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 152 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A ten year permission for minor amendments to phase 1 of the approved development under reg. ref. 14/603 and later amendments under reg. ref. 15/818. Amendments will comprise of the following; (I) construction of a new 600 sq. m covered storage and packaging plant building to adjoin the existing approved production building, (II) reduction in size of the approved packaging area by 600 sq. m, (III) relocation of the permitted biomass torrefier building by 8m to accommodate the positioning of the new covered storage and packaging plant building, (IV) all associated ancillary site works
The construction of a single storey industrial packaging shed with conveyors supply mechanism, rectangular roller tray outfeed and all ancillary site works
Construction of three covered industrial type warehouse units with associated external storage, parking and circulation areas, Upgrade of existing site services and all ancillary works associated with the site development, The application is for a 10 year permission and will include the submission of an Natura Impact Statement (NIS) to the Planning Authority
The construction of a 950m2 solar panel array with an export capacity of approximately 250KWh to be mounted on the roof of existing Bulk Store Warehouse to include ancillary works associated with the development
Construction of seven covered industrial type warehouse units (with typical maximum ridge height of 14m above raised ground level) with associated external storage, parking and circulation areas; upgrade of existing site services and all ancillary works associated with the site development. This application is for a 10-year permission
Change of use of the existing temporary store and canteen facility to a permanent welfare building associated with the existing workshop and manufacturing facility. Works will involve the redevelopment of the existing single story building, alteration to previously approved parking areas, connection to site services and associated ancillary site development works
The brief summarizes the pattern across all 152 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18491The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief