Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 886 decisions within 5 km, 5 exact-site or onsite candidate records, and 78 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
78 structured nearby appeal records.
78 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
For (a) The change of use of ancillary smoking room to additional single ensuite bedroom. (b) The partial demolition of existing partitions and construction of new partition walls in the reception area. The change of use is accommodated within the existing footprint granted under 09/1197, 14/648 and 20/120 with no additional floor area proposed
(a) the change of use of ancillary day space areas to additional bedroom space, to include the provision of 8 additional residents within 6 single en-suite bedrooms and 1 double en-suite bedroom. (b) retention of 1 window to the West Elevation, the change of use is accommodated within the existing footprint granted under 09/1197 and 14/649 with no additional floor area required
To construct a dwelling-house, entrance from existing access road, connection to existing foul/storm sewer and public water main supply with associated site works and services
To upgrade the playing surface of pitch three to an all-weather synthetic surface of 106 x 66 metres, consisting of: a 2.4 metre-high green welded mesh panel fence surrounding the pitch and an additional internal 1.2m spectator welded mesh panel fence. Behind each goal a ball stop netting, with a total height of 8 metres. Floodlighting the pitch platform to 350 lux and back lighting adjacent pitch to 150 lux with 6 number 15.2 metre-high poles with associated fittings
Development onto the R408, which will consist of the construction of a new detached fully serviced two-storey dwelling house (260sqm) and a separate detached single storey garage (40sqm). Connection to existing public mains water and a packaged wastewater treatment system and polishing filter together with all associated site works
Of an agricultural shed together with all associated ancillary site-works
The brief summarizes the pattern across all 886 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2461026The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief