Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 169 decisions within 5 km, 3 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Revised site boundaries as previously granted under planning reference 15/1082, and all associated site works
A) permission for retention of material change of use of existing domestic garage, as under granted planning reference 15/1082, to a 1-bedroomed self-contained unit for guest accommodation for private use and part-time commercial short term residential letting, with connections to all site services, b) permission for completion of works to proposed wastewater treatment system and polishing filter, as granted under planning reference no 15/1082, and c) revised site boundaries to the south of existing site
Construction of a single storey dwelling serviced with an on-site wastewater treatment system to current EPA guidelines, entrance to be accessed via existing laneway and for all associated site works
Dormer storey detached dwelling, wastewater treatment plant, new entrance and associated works
Construction of a single storey dwelling serviced with an on-site wastewater treatment system to current EPA guidelines, entrance to be accessed via existing laneway and for all associated site works
A) Demolishing existing rear annex and attached garage to the side of a single storey cottage, b) Construction of a new single storey extension to the front and rear of existing cottage, c) Alterations to all existing elevations, d) Construction of a single storey detached garage to the rear of the site, e) Installation of a new wastewater treatment system and all ancillary site works
The brief summarizes the pattern across all 169 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560186The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief