Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
20% of nearby decided applications were refused. The site check found 461 decisions within 5 km, 2 exact-site or onsite candidate records, and 36 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
36 structured nearby appeal records.
36 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of Duration of Planning Ref. No. 15/713 - for the construction of a single storey rear and side extension to existing two storey house and all associated site works
A) proposed single storey dwelling, b) proposed driveway connection to existing driveway accessed through existing property entrance, c) provision of domestic garage, d) provision of bored well, e) treatment system & percolation area along with all associated site development and facilitating works
Single storey dwelling house, upgraded recessed site entrance, septic tank, screen planting and landscaping and all associated site development works
The development consist / consists of a ground mounted solar photovoltaic (PV) farm within a site area of 26 hectares consisting of solar photovoltaic panels covering an area of up to 185,000m2 on ground mounted steel frames, 1 no; on-site substation / control room and palisade fencing, up to 5 no. inverter / transformer stations, underground cables and ducts, boundary security fence, use of existing entrance to public road at Dunmurray Springs Golf Club, upgrade to parts of existing track from the public road to the proposed solar farm, new and upgraded internal tracks, CCTV cameras, two temporary site compounds and all associated site services and works located within townlands. Permission is sought for 10 years.
For an equine bloodstock breeding facility. The proposed equine bloodstock breeding facility will involve consolidation and relocation of an established breeding business in the UK and Ireland to this location. The proposed development will consist of: A) Demolishing existing unroofed derelict building (in ruins) with materials to be reused as part of the new development, B) Construction of a new single storey stable block with a 2 storey element that will cater for 16 stable units, staff canteen, offices, viewing area, toilet facilities and associated car parking areas, C) Construction of a new equine barn with 20 horse stalls and ancillary rooms, D) Construction of staff accommodation in the form of 3 no. single storey terraced units with associated car parking areas, E) Construction of a farm managers house in the form of a part 2 storey, part single storey dwelling with a single storey integrated garage, F) Construction of a single storey isolation stable block, G) Construction of an agricultural shed providing a covered paddock area, H) Construction of a fillies barn, I) Construction of a horse walker and horse lunging ring, J) Construction of a machinery shed and an agricultural shed for hay storage with ancillary manure pit, K) Construction of a horse loading bay and wash bay area, L) Installation of waste water treatment systems to cater for all residential and equine buildings, including the installation of underground tanks, M) Upgrade to existing vehicular entrance, N) Installation of a new well, O) Construction of internal access roads, additional car parking (including EV spaces), landscaping, boundary treatments, lighting and all ancillary site works
Is sought for a period of 10 years with an operational period of up to 30 years for a ground mounted solar photovoltaic (PV) farm on a site area of 49.74 hectares within the site of the Dunmurry Springs Golf Club. The proposed development consists of solar photovoltaic panels covering an area of up to 92,024 m² on ground mounted steel frames; 1 no. 38 kV on-site substation/control room and palisade fencing; up to 10 no. inverter/transformer container units; underground cabling and ducts; boundary security fence; use of existing entrance to public road at Dunmurry Springs Golf Club; new and upgraded internal access tracks; upgrade of an existing maintenance access onto the public road; construction of a maintenance shed; CCTV cameras; 1 no. temporary site compound; landscaping and all ancillary site services and works within the townlands of
The brief summarizes the pattern across all 461 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20930The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief