17% of nearby decided applications were refused. The site check found 71 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To amend the design of the approved development (planning reference 16/1500) which comprises consent for a solar PV energy development. Proposed amendments include; (1) addition of 2no. transformer stations, (2) 2no. control buildings to be replaced by a customer substation, (3) removal of CCTV cameras, (4) minor changes to the panel layout, (5) MW output to be decreased from 5MW to 4MW, (6) change in height & number of module racks & pile driven poles & (7) project lifetime proposed to be extended from 25 to 35 years. Gross floor space of proposed works: 85.97 sqm
For a solar farm development. The development will consist of (1) a solar PV panel array on ground mounted steel frames with a maximum export capacity of 5MW within an overall site area of 11.78ha (2) underground cabling/ducting (3) two electricity control buildings (4) temporary construction compound (5) site access including a temporary construction access and track from the L-4302-63 local road (6) boundary fencing and landscaping proposals (7) pole mounted infra red security cameras together with all associated site works and services.
For the development of a 20kV cable route consisting of c.685m of overhead line supported on wooden poles and c.625m of underground cabling in ducting. This cable route will connect the permitted Ballycrissane Solar Farm (ref 16/1500) to an existing 38kv substation in the village.
To construct a new dwelling house, domestic garage, septic tank/treatment unit with percolation area and all associated site works. Gross floor space of proposed works: House - 228.2 sqm, Garage - 69.5 sqm
To construct a new dwelling house, domestic garage, treatment unit with percolation area and all associated site works. Gross floor space of proposed works: House: 260.3 sqm, Garage: 60.4 sqm
To construct 1) agricultural driveway to existing farmyard. 2) 4 bay agricultural shed with cattle crush and all associated site works. Gross floor space of proposed works: 323sqm
The brief summarizes the pattern across all 71 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360207The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief