Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 90 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For a change of house plans from those granted previously under Pl. Ref.'s 11/28 and 16/172 including all associated site works. Gross floor space of proposed works: 211 sqm
For the construction of a single storey dwelling house, waste water treatment plant with percolation area and all associated external works including a new entrance. Gross floor space of proposed works: 87.1 sqm
For installation of a Wastewater Treatment System with percolation area and all associated works. The proposed Wastewater Treatment System with percolation area is with the curtilage of a protected structure under RPS Reg No. 1016.
To construct (1) Milking parlour incorporating holding yard with crush/drafting yard, office storage rooms, meal bin, outside milk tank and plant rooms. (ii) Construction of cubicle within existing loose shed (iii) slatted tanks as feeding area and top less cubicles and all assorted site works. Gross floor space of proposed works 432sqm.
To construct (i) cubicle shed with underground effluent tanks (ii) slatted soiled water tank & all associated site works
For placement of two steel shipping containers (for storage of kayaks) on existing hard surface
The brief summarizes the pattern across all 90 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21375The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief