Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 676 decisions within 5 km, 10 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Alterations to the permitted warehouse/ workshop building permitted by Planning Reference 16/4333 (and subsequently extended by Planning Reference 21/6172) and all other ancillary site development works. The proposed development comprises alterations and reconfiguration of ground floor workshop area to accommodate additional workshops and office space, staff welfare and service areas and the provision of a new internal mezzanine first floor providing office, staff welfare and service/ plant areas. The proposed development also includes associated elevational changes to the existing building to accommodate the provision of new fire escape stairs, access ramp and service/plant areas. The proposed development is for modifications to an establishment to which the major accident directive applies and is for the purpose of activity requiring an Integrated Pollution Control Licence [Industrial Emissions Directive (IED) Licence]
Change of use from warehouse to workshop with ancillary storage, training area and office, modifications to the façade, 2 no. attached exterior store areas and all ancillary site development works - Extension of Duration to Permission granted under Planning Ref. No. 16/4333
The refurbishment, modification and change of use of existing warehouse buildings (Buildings 19, 20, 21) to form part of the Jameson Experience at The Jameson Experience Heritage Centre. The proposed works will include alterations to the existing facades and internal layout to facilitate the temporary relocation of the existing visitor centre which will consist of reception area, auditorium, whiskey tasting rooms and retail shop including off-trade whiskey sales. The temporary heritage centre will be a licensed premises, including bar, cafe/restaurant with covered outdoor seating area and a temporary structure to accommodate public toilets adjacent to the existing warehouses. The building will continue to form part of the Jameson Experience and be used for tourism uses once the temporary use ceases. The proposed development consists of the carrying out of works to a protected structure.
The subdivision of an existing warehouse to provide for the installation of a new steam boiler system and all ancillary site development works. The proposed development consists of the erection of an external piperack bridge to connect to an existing still house, the installation of 4 no. rooftop flues and elevational changes to the existing warehouse. The proposed development is for modifications to an establishment to which the Major Accident Directive applies and is for the purposes of activity requiring an integrated pollution control license [Industrial Emissions Directive (IED) License].
The construction of a new Mechanical Vapour Recompression (MVR) Evaporator Unit with ancillary fan house, 2 no. electrical switch rooms, 2 no. stillage tanks and a caustic tank. The proposed development makes provision for the relocation of existing chemical tanks, removal of existing access stairs, the provision of new access stairs and platforms and all ancillary site works
Permission for the demolition of 2 no. existing decommissioned industrial chimney stacks, comprising a boiler chimney (approximate height 46 metres) and a feeds recovery dryer stack (approximate height 41 metres), which is mounted to the roof of an existing feeds recovery building, and all ancillary site development works. The proposed development is for modifications to an establishment to which the Major Accident Directive applies and is for the purpose of activity requiring an Integrated Pollution Control Licence [Industrial Emissions Directive (IED) licence]
The brief summarizes the pattern across all 676 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5570The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief